Home Services Corporate Info Qualifications Employment Contact

 

 

 

Canopy Structure

As seen above, the canopy structure consists of open web steel joist supported by two rows of joist girders. The steel joist girders are continuous over two spans and cantilever out at the ends adjacent to the existing parking garages. The New Toll Plaza facility accommodates 9 lanes of traffic under the canopy structure and 3 lanes through the existing Hibiscus Garage.

Back To News Home

Fast-Track Relocated Toll Plaza Opens at
Fort Lauderdale-Hollywood Int'l Airport

 

As part of the South Terminal Exit Roadways Improvement project at Fort Lauderdale-Hollywood International Airport, BPA recently completed the structural design and construction inspection services for the New Toll Plaza /Administration Building facility and Mechanical Room. BPA is proud to have participated in the Team that helped implement this $9 M toll plaza relocation in record time.
 

Our role during the fast track design process included the structural design of the toll plaza canopy structure and the Administration Building located on the ground level of the Hibiscus Parking Garage. Once the design phase was completed, BPA served as special inspector providing construction inspection services for the structural components, including shop drawing approval and responding to RFIs.

 

Completed Toll Plaza

  Download BPA Miami News  
 

Ft. Lauderdale-Hollywood Int’l Airport Toll Plaza Opens

 
 

BPA Celebrates 10th Anniversary

 
 

BPA Awarded SR 80 Resurfacing Project

 

BPA Selected to Provide Design Services for SR 976

Kevin Schweikhart Named Managing Director of the new Coatings and Waterproofing Department